Owner: City of Highland
Location: Highland, CA
Value: $8.9 Million
Year: 2014

The project includes constructing a new four lane (98′ wide) bridge across the Santa Ana River approximately 250′ downstream from the existing two lane iron bridge, and realigning 3,500 feet of Greenspot Road. ┬áthe project alos includes rehabiliatation of the existing historic iron bridge to provide for pedestrian, equestrian and bicycle uses.